Description
The Nes Home 1700 x 850mm Right Hand L Shaped Shower Bath With Front End Panel & Hinged Shower Screen is a stylish and practical bathing solution designed to maximize space in your bathroom. This L-shaped bath is constructed from durable acrylic. ensuring longevity and easy maintenance. The right-hand configuration means the wider end of the bath is on the right side. providing a comfortable and spacious bathing area. The sleek square design adds a modern touch to your bathroom decor. This versatile bath allows you to enjoy both showering and bathing experiences. making it a functional and space-saving addition to any bathroom.
Specification
- Bath Type: Acrylic Bath. Shower Bath
- Length: 1700mm
- Width: 700mm
- Width: (at widest point): 850mm
- Depth: 395mm
- Water Capacity: 200L
- Guarantee: 10 Year
- Finish: White
- Shower Screen Width: 780-795mm
- Shower Screen Height: 1430mm
Package Contents
- 1 x L Shaped Shower Bath
- 1 x Hinged Bath Shower Screen
- 1 x Set of Front and End Bath Panel
- Supplied with leg set
- Taps & Bath Waste not included














Reviews
There are no reviews yet.